Retech Header Chinese Version of Website Japanese Version of Website Thermal Processing Collage
Loading

Home » Equipment » VAR

Retech's VAR-T Design for Titanium, Zirconium, and Reactive Metals

Image of VAR T Design
Retech's new VAR-T 900mm
for Titanium, Zirconium,& Hafnium

The traditional VAR-T design concept providing stability for the tallest welded artwork electrode, and configurable to specific application parameters.

The VAR-T consists of just five (5) major sub-assembly modules, independently built and tested. This modular build approach enables repeatable assembly procedures, accuracy in making critical adjustments, performing incremental inspections, testing and greatly expedites shipment, offloading and on-site erection work. In addition, all parts are pre-finished and final inspected prior to assembly work.

  1. Pylon
    Includes column swing mechanism
  2. Melt Stations
    Includes ram and furnace head body lift mechanisms
  3. Upper Head Assembly
    Consisting of Power Ram, X-Y Positioning, Load Cells and cables/bus connection
  4. Box Column
    Includes ram and furnace head body lift mechanisms
  5. Lower Head Assembly
    Depending on furnace configuration, one (1) or two (2) Melt Station water jackets are factory pre-aligned to drop-fit into the furnace base, accommodating a range of crucible sizes and matching water velocity guides, and assembled complete with stirring coils and optional melt lock valves. Connections and alignments off the Pit Floor are eliminated.

VAR-T components

VAR Brochure and Data Sheet

Request for Proposal

Image of Retech Symbol
ISO 9001 Certified Company

        © 2010 Retech Systems LLC. Vendor PO Terms and Conditions Workmanship Standards Sitemap Image of Japanese flag Image of Chisese flag